Agency Documents
Onondaga Lake
- 1. INVESTIGATIONS & STUDIES
- 2002 DECEMBER - BASELINE ECOLOGICAL RISK ASSESSMENT (BERA)
- BERA - MAIN TEXT
- BERA Chapter 01 [1.01 mb]
Onondaga Lake BERA Chapter 1 of text - BERA Chapter 02 [1.64 mb]
Onondaga Lake BERA Chapter 2 of text - BERA Chapter 03 [4.15 mb]
Onondaga Lake BERA Chapter 3 of text - BERA Chapter 04 [1.13 mb]
Onondaga Lake BERA Chapter 4 of text - BERA Chapter 05 [331 kb]
Onondaga Lake BERA Chapter 5 of text - BERA Chapter 06 [2.85 mb]
Onondaga Lake BERA Chapter 6 of text - BERA Chapter 07 [304 kb]
Onondaga Lake BERA Chapter 7 of text - BERA Chapter 08 [8.81 mb]
Onondaga Lake BERA Chapter 8 of text - BERA Chapter 09 [9.99 mb]
Onondaga Lake BERA Chapter 9 of text - BERA Chapter 1 Figures [584 kb]
Onondaga Lake BERA Chapter 1 Figures - BERA Chapter 10 [4.2 mb]
Onondaga Lake BERA Chapter 10 of text - BERA Chapter 10 Figures [59 kb]
Onondaga Lake BERA Chapter 10 Figures - BERA Chapter 11 [4.1 mb]
Onondaga Lake BERA Chapter 11 of text - BERA Chapter 11 Figures [119 kb]
Onondaga Lake BERA Chapter 11 Figures - BERA Chapter 12 [3.6 mb]
Onondaga Lake BERA Chapter 12 of text - BERA Chapter 13 [5.49 mb]
Onondaga Lake BERA Chapter 13 of text - BERA Chapter 2 Figures [112 kb]
Onondaga Lake BERA Chapter 2 Figures - BERA Chapter 3 Figures [16.87 mb]
Onondaga Lake BERA Chapter 3 Figures - BERA Chapter 4 Figures [13 kb]
Onondaga Lake BERA Chapter 4 Figures - BERA Chapter 7 Figures [312 kb]
Onondaga Lake BERA Chapter 7 Figures - BERA Chapter 8 Figures [2.95 mb]
Onondaga Lake BERA Chapter 8 Figures - BERA Chapter 9 Figures [706 kb]
Onondaga Lake BERA Chapter 9 Figures - BERA Cover Page, Table of Contents & Executive Summary [5.04 mb]
Onondaga Lake BERA - Cover, table of contents & executive summary - BERA Executive Summary Figures [18 kb]
Onondaga Lake BERA Executive Summary Figures - BERA Tables [1.19 mb]
Onondaga Lake BERA Tables
- BERA Chapter 01 [1.01 mb]
- BERA APPENDICES
- BERA Appendix A [479 kb]
Onondaga Lake BERA Appendix A - BERA Appendix B [693 kb]
Onondaga Lake BERA Appendix B - BERA Appendix C [1.31 mb]
Onondaga Lake BERA Appendix C - BERA Appendix D [4.29 mb]
Onondaga Lake BERA Appendix D - BERA Appendix E [3.02 mb]
Onondaga Lake BERA Appendix E - BERA Appendix F [5.68 mb]
Onondaga Lake BERA Appendix F - BERA Appendix G [12.71 mb]
Onondaga Lake BERA Appendix G - BERA Appendix H [761 kb]
Onondaga Lake BERA Appendix H - BERA Appendix I [2.54 mb]
Onondaga Lake BERA Appendix I
- BERA Appendix A [479 kb]
- BERA - MAIN TEXT
- 2002 DECEMBER - HUMAN HEALTH RISK ASSESSMENT (HHRA)
- HHRA - MAIN TEXT
- HHRA Figures [1.73 mb]
Onondaga Lake HHRA Figures - HHRA Tables [238 kb]
Onondaga Lake HHRA Tables - HHRA Text [35.58 mb]
Onondaga Lake HHRA Text
- HHRA Figures [1.73 mb]
- HHRA APPENDICES
- HHRA Appendix A [6.27 mb]
Onondaga Lake HHRA Appendix A - HHRA Appendix B [4.26 mb]
Onondaga Lake HHRA Appendix B - HHRA Appendix C [377 kb]
Onondaga Lake HHRA Appendix C - HHRA Appendix D [596 kb]
Onondaga Lake HHRA Appendix D - HHRA Appendix E [398 kb]
Onondaga Lake HHRA Appendix E
- HHRA Appendix A [6.27 mb]
- HHRA - MAIN TEXT
- 2002 DECEMBER - REMEDIAL INVESTIGATION (RI)
- RI - MAIN TEXT, TABLES & FIGURES
- RI Chapter 01 [1.93 mb]
Onondaga Lake RI Chapter 01 Text - RI Chapter 02 [7.74 mb]
Onondaga Lake RI Chapter 02 Text - RI Chapter 03 [3.04 mb]
Onondaga Lake RI Chapter 03 Text - RI Chapter 04 [4.46 mb]
Onondaga Lake RI Chapter 04 Text - RI Chapter 05 [6.68 mb]
Onondaga Lake RI Chapter 05 Text - RI Chapter 06 [17.72 mb]
Onondaga Lake RI Chapter 06 Text - RI Chapter 07 [1.65 mb]
Onondaga Lake RI Chapter 07 Text - RI Chapter 08 [2.22 mb]
Onondaga Lake RI Chapter 08 Text - RI Chapter 09 [1.39 mb]
Onondaga Lake RI Chapter 09 Text - RI Chapter 10 [3.28 mb]
Onondaga Lake RI Chapter 10 Text - RI Executive Summary [2.96 mb]
Onondaga Lake RI Executive Summary - RI Figures 1-1 to 1-7 [1.28 mb]
Onondaga Lake RI Main Figures - 1-1 to 1-7 - RI Figures 2-1 to 2-21 [1.59 mb]
Onondaga Lake RI Main Figures 2-1 to 2-21 - RI Figures 3-1 to 3-11 [1.46 mb]
Onondaga Lake RI Main Figures 3-1 to 3-11 - RI Figures 4-1 to 4-15 [8.53 mb]
Onondaga Lake RI Main Figures 4-1 to 4-15 - RI Figures 5-1 to 5-29 [8.92 mb]
Onondaga Lake RI Main Figures 5-1 to 5-29 - RI Figures 5-113 to 5-173 [2.66 mb]
Onondaga Lake RI Main Figures 5-113 to 5-173 - RI Figures 5-30 to 5-112 [1002 kb]
Onondaga Lake RI Main Figures 5-30 to 5-112 - RI Figures 6-1 to 6-46 [3.82 mb]
Onondaga Lake RI Main Figures 6-1 to 6-46 - RI Figures 7-1 [242 kb]
Onondaga Lake RI Main Figures 7-1 - RI Figures 8-1 to 8-2 [45 kb]
Onondaga Lake RI Main Figures 8-1 to 8-2 - RI Inside Covers [27 kb]
Onondaga Lake RI Inside Covers - RI Table of Contents [5.1 mb]
Onondaga Lake RI Table of Contents - RI Tables [779 kb]
Onondaga Lake RI Tables
- RI Chapter 01 [1.93 mb]
- RI APPENDICES
- RI Appendix A [6.12 mb]
Onondaga Lake RI Appendix A - RI Appendix B [13.27 mb]
Onondaga Lake RI Appendix B - RI Appendix C [3.59 mb]
Onondaga Lake RI Appendix C - RI Appendix D [1.31 mb]
Onondaga Lake RI Appendix D - RI Appendix E [9.11 mb]
Onondaga Lake RI Appendix E - RI Appendix F [25.41 mb]
Onondaga Lake RI Appendix F - RI Appendix G [2.33 mb]
Onondaga Lake RI Appendix G - RI Appendix H [917 kb]
Onondaga Lake RI Appendix H - RI Appendix I [4.8 mb]
Onondaga Lake RI Appendix I
- RI Appendix A [6.12 mb]
- RI - MAIN TEXT, TABLES & FIGURES
- 2004 NOVEMBER - FEASIBILITY STUDY (FS)
- APPENDICES
- FS APPENDIX B - DESCRIPTION OF SEDIMENT MANAGEMENT UNITS
- Appendix B - Description of Sediment Management Units [322 kb]
Last modified on 2010-03-17
- Appendix B - Description of Sediment Management Units [322 kb]
- FS APPENDIX E - VOLUME ESTIMATES
- Appendix E - Volume Estimates [401 kb]
Last modified on 2010-03-18
- Appendix E - Volume Estimates [401 kb]
- FS Appendix A - References [259 kb]
Onondaga Lake FS Appendix A - References - FS Appendix C - Applicable or Relevant and Appropriate Requirements [1.52 mb]
Onondaga Lake FS Appendix C - Applicable or Relevant Requirements - FS Appendix D - Part A: Groundwater Flow to Onondaga Lake - Part B: Groundwater Model Documentation [7.61 mb]
Onondaga Lake FS Appendix D - Part A: Groundwater Flow - Part B: Groundwater Model Documentation - FS Appendix F - Cost Estimate [489 kb]
Onondaga Lake FS Appendix F - Cost Estimate - FS Appendix G - Technical Basis for Preliminary Remedication Goals for Fish Tissue in Onondaga Lake [313 kb]
Onondaga Lake FS Appendix G - Technical Basis for Preliminary Remedication Goals for Fish Tissue in Onondaga Lake - FS Appendix H - Technical Evaluation of In Situ Capping as a Remedy Component For Onondaga Lake [6.39 mb]
Onondaga Lake FS Appendix H - Technical Evaluation of In Situ Capping as a Remedy Component - FS Appendix I - Implementation and Residual Risk Evaluation for Onondaga Lake [8.26 mb]
Onondaga Lake FS Appendix I - Implementation and Residual Risk Evaluation - FS Appendix J - Application of NYSDEC Sediment Effects Concentrations (SECs) for Evaluating Sediment Quality in Onondaga Lake [1.97 mb]
Onondaga Lake FS Appendix J - Application of NYSDEC Sediment Effects Concentrations (SECs) for Evaluating Sediment Quality - FS Appendix K - Sediment Management and Supernatant Water Treatment Cost Estimates [663 kb]
Onondaga Lake FS Appendix K - Sediment Management and Supernatant Water Treatment Cost Estimates - FS Appendix L - Evaluation of Dredging Options [1.44 mb]
Onondaga Lake FS Appendix L - Evaluation of Dredging Options - FS Appendix M - Integrating Habitat Considerations in the Remedial Alternatives [3.71 mb]
Onondaga Lake FS Appendix M - Integrating Habitat Considerations in the Remedial Alternatives - FS Appendix N - Monitored Natural Recovery [1.32 mb]
Onondaga Lake FS Appendix N - Monitored Natural Recovery
- FS APPENDIX B - DESCRIPTION OF SEDIMENT MANAGEMENT UNITS
- TABLES AND FIGURES
- FS Section 1 - Figures [16.68 mb]
Onondaga Lake FS Section 1 Figures - FS Section 1 - Tables [457 kb]
Onondaga Lake FS Section 1 - Tables - FS Section 2 - Figures [1.28 mb]
Onondaga Lake FS Section 2 - Figures - FS Section 2 - Tables [282 kb]
Onondaga Lake FS Section 2 - Tables - FS Section 3 - Figures [928 kb]
Onondaga Lake FS Section 3 - Figures - FS Section 3 - Tables [304 kb]
Onondaga Lake FS Section 3 - Tables - FS Section 4 - Tables [415 kb]
Onondaga Lake FS Section 4 - Tables - FS Section 5 - Figures [107 kb]
Onondaga Lake FS Section 5 - Figures - FS Section 5 - Tables [249 kb]
Onondaga Lake FS Section 5 - Tables - FS Section 6 - Figures [7.33 mb]
Onondaga Lake FS Section 6 - Figures - FS Section 6 - Tables [25 kb]
Onondaga Lake FS Section 6 - Tables
- FS Section 1 - Figures [16.68 mb]
- FS - Executive Summary [6.98 mb]
Onondaga Lake Feasibility Study Executive Summary - FS - Text [4.54 mb]
Onondaga Lake Feasibility Study - Text
- APPENDICES
- BASELINE MONITORING DOCUMENTS
- 2008 May - Baseline Monitoring Book 1 Work Plan [1.61 mb]
Onondaga Lake Baseline Monitoring Book 1 Deep Basin Water and Zooplankton Monitoring Work Plan for 2008, May 2008 - 2008 September - Baseline Monitoring Book 2 Work Plan [6.19 mb]
Onondaga Lake Baseline Monitoring Book 2 Work Plan - Fish, Invertebrate, and Littoral Water Monitoring for 2008, September 2008 - 2009 August - Baseline Monitoring Book 2 Addendum 1 Work Plan [670 kb]
Onondaga Lake Baseline Monitoring Book 2 Addendum 1 Fish, Invertebrate, and Littoral Water Monitoring for 2008, August 2009 - 2009 September - Baseline Monitoring Book 1 Addendum 1 Work Plan [697 kb]
Onondaga Lake Baseline Monitoring Book 1 Addendum 1 Deep Basin Water and Zooplankton Monitoring Work Plan for 2008, September 2009 - 2010 April - Addendum 2 to Baseline Monitoring Book 1 Deep Basin Water and Zooplankton Monitoring WP for 2008 [264 kb]
Onondaga Lake - Addendum 2 (2010) to Onondaga Lake Baseline Monitoring Book 1 Deep Basin Water and Zooplankton Monitoring Work Plan for 2008 - April 2010 - 2010 February - Addendum to Baseline Monitoring - Book 3 [18 kb]
Onondaga Lake Baseline Monitoring Addendum - Book 3, Tributary Monitoring Work Plan for 2009 (Snowmelt Sampling), February 2010 - 2010 July - Baseline Monitoring Book 2 Addendum 2 [804 kb]
Onondaga Lake Baseline Monitoring Book 2 Addendum 2 - Fish, Invertegrate, & Littoral Water Monitoring for 2008, July 2010 - 2010 July - Baseline Monitoring Scoping Document for the Onondaga Lake Bottom Subsite [780 kb]
Onondaga Lake Baseline Monitoring Scoping Document, July 2010 - 2011 Dec - Onondaga Lake Baseline Monitoring Rpt for 2010 [8.7 mb]
Onondaga Lake Baseline Monitoring Report for 2010 - December 2011 - 2011 Feb - Onondaga Lake Baseline Monitoring Book 3 Tributary Monitoring Work Plan for 2009 [1.07 mb]
Onondaga Lake Baseline Monitoring Book 3 Tributary Monitoring Work Plan for 2009, February 2011 - 2011 June - Addendum 1 (2011) to OL Baseline Monitoring Book 3 Tributory Monitoring WP for 2009 [433 kb]
Addendum 1 (2011) to Onondaga Lake Baseline Monitoring Book 3 Tributary Monitoring Work Plan for 2009, June 2011 - 2011 May - Addendum 3 (2011) Onon Lk Baseline Monitoring Book 2 [502 kb]
Addendum 3 (2011) Onondaga Lake Baseline Monitoring Book 2, Fish, Invertebrate, and Littoral Water Monitoring for 2008 - May 2011 - 2011 May - Addendum 3 (2011) to Onon Lk Baseline Monitoring Book 1 Deep Basin Water and Zooplankton Monitoring WP for 2088 [342 kb]
Addendum 3 (2011) to Onondaga Lake Baseline Monitoring Book 1 Deep Basin Water and Zooplankton Monitoring Work Plan for 2008 - May 2011 - 2011 May - Onondaga Lake Water Quality Monitoring for Construction Baseline WP [2.33 mb]
Onondaga Lake - Water Quality Monitoring for Construction Baseline Work Plan - May 2011 - 2011 Oct - Onondaga Lake PDI Phase VI 2010 WQ Monitoring Summary Report [5.88 mb]
Onondaga lake PDI Phase Vi 2010 Water Quality Monitoring For Construction Baseline Data Summary Report - October 2011 - 2011 October - Onondaga Lake Baseline Monitoring Report for 2009 [2.63 mb]
Onondaga Lake Baseline Monitoring Report, October 2011
- 2008 May - Baseline Monitoring Book 1 Work Plan [1.61 mb]
- CULTURAL RESOURCES DOCUMENTS
- 2010 April - Cultural Resource Mgmt Report Phase 1B Archaeological Work Plan Addendum [89.29 mb]
Onondaga Lake - Cultural Resource Management Report Phase 1B Archaeological Work Plan Addendum, April 30, 2010 - 2010 January - Underwater Archaeological Resources Phase 1B Work Plan [3.63 mb]
Underwater Archeological Resources Phase 1B Work Plan for the Onondaga Lake Bottom, January 2010 - 2010 June - Cultural Resource Mgmt Report Phase 1B Archaeological Work Plan, Revised Table 1 [5.67 mb]
Onondaga Lake, Cultural Resource Management Report Phase 1B Archaeological Work Plan, Revised Table 1 - June 7, 2010 - 2011 April - Cultural Resource Mgmt Rpt Phase 1B Reconnaissance Survey Onondaga Lake, Slurry Pipeline [86.68 mb]
Cultural Resource Management Report Phase 1B Reconnaissance Survey Onondaga Lake Project, Upland and Shoreline Area Slurry Pipeline & Fiber Optic Line, April 12, 2011 - 2011 July - Cultural Resource Mgmt Report Phase 1 Reconnaissance Survey [21.73 mb]
Cultural Resource Mgmt Report Phase 1 Reconnaissance Survey, Onondaga Lake Project, Upland and Shoreline Area, Lakeshore Complex, July 26, 2011 - 2011 Oct - Final Phase 1B Underwater Archaeological Report for the Onondaga Lake Bottom [21.06 mb]
Final Phase 1B Underwater Archaeological Report for the Oondaga Lake Bottom, October 2011 - 2014 Sept - Draft Phase 3 Underwater Archaeological Rpt for the OL BottomFinal Onondaga Phase III Underwater Report 10-9-14.docx [20.25 mb]
Draft Phase 3 Underwater Archaeological Rpt for the OL Bottom - September 2014
- 2010 April - Cultural Resource Mgmt Report Phase 1B Archaeological Work Plan Addendum [89.29 mb]
- DEEP WATER DOCUMENTS
- 2007 August - Final Data Usability and Summary Report Evaluation of Nitrate Addition [1.64 mb]
Onondaga Lake Final Data Usability and Summary Report Evaluation of Nitrate Addition to Control Methylmercury Production: 2006 Study - August 2007 - 2007 December - SMU 8 Sediment Inubations & Supporting Studies Work Plan [637 kb]
SMU 8 Sediment Incubations and Supporting Studies Work Plan - December 2007 - 2007 May - Preliminary Feasibility Analysis for Control of Methylmercury Production [471 kb]
Onondaga Lake Preliminary Feasibility Analysis for Control of Methylmercury Production in the Lower Waters Through Nitrate Addition, May 2007 - 2007 May - Work Plan for Evaluation of Nitrate Addition to Control Methylmercury Production in Onondaga Lake [179 kb]
Onondaga Lake - Work Plan for Evaluation of Nitrate Addition to Control Methylmercury Production in Onondaga Lake, May 2007 Study - 2008 April - Interpretive Report Eval of Nitrate Addition to Control Methylmercury Production in Onondaga Lake (2006 Study) [478 kb]
Interpretive Report Evaluation of Nitrate Addition to Control Methylmercury Production in Onondaga Lake: 2006 Study - April 2008 - 2008 January - Nitrate Work Plan Appendix B QAPP [6.59 mb]
Work Plan for Evaluation of Nitrate Addition to Control Methylmercury Production in Onondaga Lake, 2007 Study - January 2008, Appendix B QAPP - 2008 June - Dye Tracer Study Work Plan [478 kb]
Dye Tracer Study to Evaluate Transport and Mixing in the Hypolimion Work Plan - June 2008 - 2008 September - DUSR Evaluation of Nitrate Addition to Control Methylmercury Production [541 kb]
Data Usability and Summary Report Evaluation of Nitrate Addition to Control Methylmercury Production in Onondaga Lake: 2007 Study - September 2008 - 2008 September - Microbead Marker for Monitoring Natural Recovery in SMU 8 Work Plan [983 kb]
Microbead Marker for Monitoring Natural Recovery in SMU 8 Work Plan - September 2008 - 2009 August - Microbead Marker 2008 Pre-Mob Field Test Data Summary Report [5.19 mb]
Microbead Marker 2008 Pre-Mobilization Field Test Data Summary Report - August 2009 - 2009 July - Report on 2008 Dye Tracer Study to Evaluate Transport & Mixing in the Hypolimnion [864 kb]
Report on 2008 Dye Tracer Study to Evaluate Transport and Mixing in the Hypolimnion of Onondaga Lake, July 2009 - 2009 June - Work Plan to Perform a Nitrate Application Field Trial [236 kb]
Onondaga Lake Nitrate Application Field Trial in the Hypolimnion Work Plan - June 2009 - Final - 2010 March - Report for the Nitrate Application Field Trial in Hypolimnion of Onondaga Lake [2.92 mb]
Report for the Nitrate Application Field Trial In the Hypolimnion of Onondaga Lake - March 2010 - 2011 July - Data Report: Sediment Incubations and Supporting Studies for SMU 8 [7.18 mb]
Data Report: Sediment Incubation and Supporting Studies for Onondaga Lake SMU 8, July 2011 - 2011 March - Work Plan for Pilot Test to add Nitrate to The Hypolimnion of Onondaga Lake [3.56 mb]
Work Plan for Pilot Test to add Nitrate to the Hypolimnion of Onondaga Lake, March 2011
- 2007 August - Final Data Usability and Summary Report Evaluation of Nitrate Addition [1.64 mb]
- PRELIMINARY DESIGN INVESTIGATION (PDI) DOCUMENTS
- 2005 SEPTEMBER - PDI PHASE I WORK PLAN
- 2005 August - Appendix C - PDI Phase I PSP [4.73 mb]
Appendix C - PDI Phase I Project Safety Plan - 2005 November - Appendix D - PDI AEO Work Plan [992 kb]
Appendix D - PDI Air Emissiona nd Odor Work Plan - 2005 September - PDI Phase I Work Plan [2.83 mb]
PDI Phase I Work Plan - Text, Tables and Figures - 2005 September - Appendix A - PDI Phase I SAP [202 kb]
Appendix A - PDI Phase I Sampling and Analysis Plan - 2005 September - Appendix B - PDI QAPP [2.38 mb]
Appendix B - Quality Assurance Project Plan
- 2005 August - Appendix C - PDI Phase I PSP [4.73 mb]
- 2008 JUNE - PDI PHASE I WIND TUNNEL TESTING REPORT
- 2008 June - PDI Phase I Wind Tunnel Testing Report Appendix B [7.97 mb]
Onondaga Lake PDI Phase I Wind Tunnel Testing Report Appendix B - June 2008 - 2008 June - PDI Phase I Wind Tunnel Testing Report Appendix C, D,E [7.03 mb]
Onondaga Lake PDI Phase I Wind Tunnel Testing Report Appendix C, D,E - June 2008 - 2008 June PDI Phase I Wind Tunnel Testing Rept Text, Tables, Figures & Appendix A [1.72 mb]
Onondaga Lake PDI Phase I Wind Tunnel Testing Rept - Text, Tables, Figures & Appendix A - June 2008
- 2008 June - PDI Phase I Wind Tunnel Testing Report Appendix B [7.97 mb]
- 2009 AUGUST - ONONDAGA LAKE PDI PHASE II DSR
- APPENDIX B - LAKE VIBRACORE-BORING LOGS
- App B - Deep Boring Logs [2.47 mb]
Appendix B - Deep Boring Logs - App B - ILWD Vibracore Logs [28.26 mb]
Appendix B - ILWD Vibracore Logs - App B - Phase II Vibracore Logs [24.54 mb]
Appendix B - Phase II Vibracore Logs
- App B - Deep Boring Logs [2.47 mb]
- APPENDIX C - CONSOLIDATION AND SEEPAGE INDUCED CONSOLIDATION (SIC) DATA
- App C - DEC OL Phase II PDI Geotech Consolidation Tests [2.43 mb]
Appendix C - DEC OL Phase PDI Geotech Consolidation Tests - App C - SICT Sample Lab Test Reports [25.86 mb]
Appendix C - SICT Sample Lab Test Reports
- App C - DEC OL Phase II PDI Geotech Consolidation Tests [2.43 mb]
- APPENDIX H - ODORS AND EMISSIONS TEST DATA
- APP H - PHASE II DATA
- Braun Interlec Data [3.99 mb]
- Columbia Analytical Data [645 kb]
- St Croix Sensory Data [2.16 mb]
- APP H - PHASE IIA DATA
- Columbia Data [114 kb]
- Parsons OL SCS Report 717804 [402 kb]
- Parsons Onondaga Braun Lab Report [342 kb]
- APP H - PHASE II DATA
- 2009 August - Onondaga Lake PDI Phase II DSR [34.45 mb]
Onondaga Lake Pre-Design Investigation Phase II Data Summary Report, Text, Tables, Figures, August 2009 - Appendix A - DUSR March 07 [3.03 mb]
Appendix A - Data Usability Summary Report March 07 - Appendix D - Porewataer Equalibration Study Report [286 kb]
Appendix D - Porewater Equilibration Study Report - Appendix E - Geoprobe Conductivity and Temperature Profiles [1.38 mb]
Appendix E - Geoprobe Conductivity and Temperature Profiles - Appendix E - Isotope and Packer Test Results [74 kb]
Appendix E - Isotope and Packer Test Results - Appendix G - Effluent Elutriate Test (EET) Data [2.75 mb]
Appendix G - Effluent Elutriate Test (EET) Data - Appendix I - Column Settling Test (CST) Data [14.97 mb]
Appendix I - Column Settling Test (CST) Data - Appendix J - Cap Design Bench Scale Study Summary Report [3.49 mb]
Appendix J - Cap Design Bench Scale Study Summary Report - Appendix K - Wastebed 13 CPTU Data [24.12 mb]
Appendix K - Wastebed 13 CPTU Data - Appendix L - Wastebed 13 Boring-Piexometer Logs [19.31 mb]
Appendix L - Wastebed 13 Boring-Piezometer Logs - Appendix M - SCA Consolidation, UU, and CIU Data [17.81 mb]
Appendix M - SCA Consolidation, UU, and CIU Data - Appendix N - Meterorological Station Data [3.81 mb]
Appendix N - Meteorological Station Data
- APPENDIX B - LAKE VIBRACORE-BORING LOGS
- 2011 AUGUST - FINAL ONONDAGA LAKE PDI PHASE VI DATA SUMMARY REPORT
- 2011 August - Appendix A - DUSR Phase VI [1.04 mb]
Appendix A - DUSR Onondaga Lake PDI Phase VI - 2011 August - Appendix B - Vibracore and Boring Logs [28.32 mb]
Appendix B - Vibracore and Boring Logs, August 2011 - 2011 August - Appendix C - Meteorological Station Data [1.71 mb]
Appendix C - Meteorological Station Data, August 2011 - 2011 August - Final Oondaga Lake PDI Phase VI Data Summary Report [7.81 mb]
Final Onondaga Lake PDI Phase VI Data Summary Report, Text, Tables, Figures - August 2011
- 2011 August - Appendix A - DUSR Phase VI [1.04 mb]
- 2011 JAN - ONONDAGA LAKE PDI PHASE IV DSR
- 2011 Jan - Onondaga Lake PDI Phase IV DSR [3.94 mb]
Onondaga Lake Pre-Design Investigation Phase IV Data Summary Report, Text, Table and Figures, January 2011 - Appendix A - DUSR [1.05 mb]
Appendix A - Data Usability Summary Report, Jan 2011 - Appendix B - Vibracore Logs [7.43 mb]
Appendix B - Vibracore Logs - Appendix C - Cap Amendment Isotherm Development (Addendum 2) [18.65 mb]
Appendix C - Cap Amendment Isoltherm Development (Addendum 2) - Appendix D - Mechanical Dewatering Evaluation (Addendum 4) [743 kb]
Appendix D - Mechanical Dewatering Evaluation (Addendum 4) - Appendix E - Cap pH Amendment Study (Addendum 7) [26 kb]
Appendix E - Cap pH Amendment Study (Addendum 7) - Appendix F - SMU 8 High Resolution Cores (Addendum 8) [1.53 mb]
Appendix F - SMU 8 - SMU 8 High Resolution Cores ( Addendum 8) - Appendix G - Geoprobe Profiles [447 kb]
Appendix G - Geoprobe Profiles - Appendix H - Habitat Investigation (Addendum 1) [83.47 mb]
Appendix H - Habitat Investigation (Addendum 1) - Appendix I - Meterorological Station Data [3.44 mb]
Appendix I - Meterorological Station Data
- 2011 Jan - Onondaga Lake PDI Phase IV DSR [3.94 mb]
- 2011 JAN - ONONDAGA LAKE PDI PHASE V DSR
- 2011 JANUARY - FINAL ONONDAGA LAKE PDI PHASE V DATA SUMMARY REPORT
- 2011 Jan - Final Onondaga Lake PDI PhaseV Data Summary Report [9.01 mb]
Final Onondaga Lake Pre-Design Investigation Phase V Data Summary Report - Text, Tables, Figures - January 2011 - Appendix A - DUSR - March 2010 [869 kb]
Appendix A - Data Usability Summary Report, Onondaga Lake PDI Phase V - March 2010 - Appendix B - Vibracore and Borehole Logs [25.96 mb]
Appendix B - Vibracore and Borehole Logs - Appendix C - Habitat Investigation [41.12 mb]
Appendix C - Habitat Investigation, Text, Table, Figures 1-5, Janaury 2011 - Appendix C - Habitat Investigation - Figures 6 to 36 [34.82 mb]
Appendix C - Habitat Investigation - Figure 6 to 36 - Appendix D - Meteorological Station Data [4.96 mb]
Appendix D - Meteorological Station Data
- 2011 Jan - Final Onondaga Lake PDI PhaseV Data Summary Report [9.01 mb]
- 2011 Jan - Onondaga Lake PDI Phase IV DSR [3.94 mb]
Onondaga Lake Pre-Design Investigation Phase IV Data Summary Report, Text, Table and Figures, January 2011 - Appendix A - DUSR [1.05 mb]
Appendix A - Data Usability Summary Report, Jan 2011 - Appendix B - Vibracore Logs [7.43 mb]
Appendix B - Vibracore Logs - Appendix C - Cap Amendment Isotherm Development (Addendum 2) [18.65 mb]
Appendix C - Cap Amendment Isoltherm Development (Addendum 2) - Appendix D - Mechanical Dewatering Evaluation (Addendum 4) [743 kb]
Appendix D - Mechanical Dewatering Evaluation (Addendum 4) - Appendix E - Cap pH Amendment Study (Addendum 7) [26 kb]
Appendix E - Cap pH Amendment Study (Addendum 7) - Appendix F - SMU 8 High Resolution Cores (Addendum 8) [1.53 mb]
Appendix F - SMU 8 - SMU 8 High Resolution Cores ( Addendum 8) - Appendix G - Geoprobe Profiles [447 kb]
Appendix G - Geoprobe Profiles - Appendix H - Habitat Investigation (Addendum 1) [83.47 mb]
Appendix H - Habitat Investigation (Addendum 1) - Appendix I - Meterorological Station Data [3.44 mb]
Appendix I - Meterorological Station Data
- 2011 JANUARY - FINAL ONONDAGA LAKE PDI PHASE V DATA SUMMARY REPORT
- 2006 August - PDI: Equilibrium Study Work Plan [54 kb]
Onondaga Lake PDI: Equilibrium Study Work Plan, August 2006 - 2006 September - PDI: Phase II Work Plan [4.07 mb]
Onondaga Lake PDI: Phase II Work Plan, September 2006 - 2007 Apr - OL PDI Phase I Data Summary Report [41.23 mb]
Onondaga Lake Pre-Design Investigation: Phase I data Summary Report, April 2007 - 2007 August - PDI: Phase III Addendum 2 Work Plan [1.93 mb]
Onondaga Lake PDI: Phase III Addendum 2 Work Plan - August 2007 - 2007 July - PDI: Phase III Addendum 1 Work Plan [1.48 mb]
Onondaga Lake PDI: Phase III Addendum 1 Geotextile Tube Evaluation Bench-Scale Testing Work Plan, July 2007 - 2007 May - PDI: Phase III Work Plan [130 kb]
Onondaga Lake PDI: Phase III Work Plan - May 2007 - 2007 November - PDI: Phase I Geophysical Suvey Report [35.8 mb]
Onondaga Lake PDI: Phase I Geophysical Survey Report - November 2007 - 2007 October - PDI: Phase III Addendum 4 Work Plan [5.47 mb]
Onondaga Lake PDI: Phase III Addendum 4 Work Plan, October 2007 - 2007 October - PDI: Phase III Addendum 3 Work Plan [95 kb]
Onondaga Lake PDI: Phase III Addendum 3 Cap Design Bench Scale Column Studies Work Plan, October 2007 - 2007 October - PDI: Phase III Addendum 5 Work Plan [1.9 mb]
Onondaga Lake PDI: Phase III Addendum 5 Work Plan, October 2007 - 2008 December - PDI: Wastebed 13 Settlement Pilot Study Monitoring Data - Yr 2 [7.68 mb]
Onondaga Lake PDI: Wastebed 13 Settlement Pilot Study Monitoring Data - Year 2, December 2008 - 2008 February PDI: Phase II & III Odorant Characterization and Analysis Summary Report [8.4 mb]
Onondaga Lake PDI: Phase II & III Odorant Characterization and Analysis Summary Report - February 2008 - 2008 January - PDI: Meteorological Monitoring Program Manual [4.68 mb]
Onondaga Lake PDI: Meteorological Monitoring Program Manual - January 2008 - 2008 January - PDI: Phase III Addendum 6 Work Plan [6.01 mb]
Onondaga Lake PDI: Phase III Work Plan Addendum 6 SMU 8 Sampling to Monitor Natural Recovery Work Plan, January 2008 - 2008 July - PDI: Phase IV Addendum 2 [3.6 mb]
Onondaga Lake PDI: Phase IV Addendum 2 Cap Amendment Study Isotherm Development - July 2008 - 2008 July - PDI: Phase IV Addendum 4 Work Plan [239 kb]
Onondaga Lake PDI: Phase IV Work Plan - Addendum 4 Mechanical Dewatering Evaluation, July 2008 - 2008 July - PDI: Phase IV Addendum 1 Work Plan [1.68 mb]
Onondaga Lake PDI: Phase IV Addendum 1 Habitat Work Plan, July 2008 - 2008 June - PDI: Phase III Addendum 6 Data Summary Report [17.93 mb]
Onondaga Lake PDI: Phase III Addendum 6 Data Summary Report - June 2008 - 2008 June - PDI: Phase IV Work Plan [28.05 mb]
Onondaga Lake PDI: Phase IV Work Plan, June 2008 - 2008 June - PDI: Wastebed 13 Settlement Pilot Study Data Summary Rpt [3.84 mb]
Onondaga Lake PDI: Wastebed 13 Settlement Pilot Study Data Summary Report with Tables - June 2008 - 2008 March - PDI: Phase III Addendum 7 Work Plan, Air Emissions and Odors [891 kb]
Onondaga Lake PDI: Phase III Addendum 7 Work Plan, Air Emissions and Odors - March 2008 - 2008 November - PDI: Phase IV Addendum 8 Work Plan [912 kb]
Onondaga Lake PDI: Phase IV Addendum 8 SMU 8 High-Resolution Cores Work Plan, November 2008 - 2008 November - PDI: Phase IV: Addendum 7 Cap pH Amendment Evaluation [127 kb]
Onondaga Lake PDI: Phase IV: Addendum 7 Cap pH Amendment Evaluation - November 2008 - 2009 August - PDI: Phase V Work Plan [3.48 mb]
Onondaga Lake PDI: Phase V Work Plan, August 2009 - 2009 February - Proposed Study of the 30" & 24" Force Mains [15.44 mb]
Onondaga Lake Proposed study of the 30" & 24" force mains that currently convey leachate from the SB 9-15 retention ponds to Metro, February 2009 - 2009 January - PDI Phase IV PDI Work Plan Addendum 3 [4.1 mb]
Onondaga Lake PDI: Phase IV Work Plan - Addendum 3 Cap Design Bench-Scale Testing: Additional Column Studies & Isoltope Degradation Evaluation - January 2009 - 2009 July - PDI: Wastebed 13 Settlement Pilot Study Monitoring Data - Yr 3 [2.55 mb]
Onondaga Lake PDI: Wastebed 13 Settlement Pilot Study Monitoring Data - Year 3, July 2009 - 2009 June - PDI: Phase IV Addendum 7: Additional Scope [681 kb]
Onondaga Lake PDI: Phase IV Addendum 7 Additional Scope, June 30, 2009 - 2009 March - PDI: Phase IV Addendum 6 Work Plan [12.24 mb]
Onondaga Lake PDI: Phase IV Addendum 6 - Bulk Sediment Collection, Dewatering Treatability Study, Material Compatability and Dret Testing Work Plan, March 2009 - 2009 November - PDI Phase V Addendum 6 Work Plan [2.51 mb]
Onondaga Lake PDI: Phase V Addendum 6 - Additional Sediment Sampling for SMU 5, November 2009 - 2009 September - PDI: Phase V Addendum 2 Work Plan [1.4 mb]
Onondaga Lake PDI: Phase V Addendum 2 Biological Decay Batch Study Work Plan, September 2009 - 2009 September - PDI: Phase V Addendum 3 Work Plan [1.43 mb]
Onondaga Lake PDI: Phase V Addendum 3 Porewater Work Plan, September 2009 - 2010 April - PDI Phase VI Work Plan - Addendum 5 SMU 8 PECQ Sediment Sampling [1.57 mb]
Onondaga Lake PDI: Phase VI Work Plan - Addendum 5 SMU 8 PECQ Sediment Sampling, April 2010 - 2010 January - PDI: Phase V Addendum 1 Work Plan [1.32 mb]
Onondaga Lake PDI: Phase V Addendum 1 Habitat Work Plan, January 2010 - 2010 July - Phase VI PDI Work Plan Addendum 4 [1.96 mb]
Onondaga Lake Phase VI Pre-Design Investigation Action Item Ops-4e Work Plan Addendum 4 - Dredge Stability and Upwelling Geotechnical Borings, July 13, 2010 - 2010 May - PDI Phase VI Addendum 1 Carbon Isotherm Study Work Plan - Revised [273 kb]
Onondaga Lake PDI Phase VI Action Item Cap-19h Addendum 1 Carbon Isotherm Study Work Plan - Revised, May 2010 - 2010 May - PDI Phase VI Addendum 2 pH Column Studies Work Plan [2.89 mb]
Onondaga Lake PDI Phase VI Addendum 2 pH Column Studies Work Plan - May 2010 - 2010 May - PDI: Phase VI Work Plan [4.85 mb]
Onondaga Lake Pre-Design Investigation: Phase VI Work Plan, May 2010 - 2010 October - PDI: Phase VI WP - Addendum 3 Baseline Water Quality Monitoring for Construction [691 kb]
Onondaga Lake Pre-Design Investigation: Phase VI Work Plan -Addendum 3 - 2010 Baseline Water Quality Monitoring for Construction, October 2010 - 2011 July - 2011 Lake Field Work Proposed Sediment Sampling Scope [2.48 mb]
2011 Lake Field Work Proposed Sediment Sampling Scope, July 18, 2011 - 2013 Jan - Onondaga Lake PDI Phase VII DSR [40.13 mb]
Onondaga Lake PDI Phase VII DSR - Jan 2013
- 2005 SEPTEMBER - PDI PHASE I WORK PLAN
- 2010 March - Wetlands/Floodplain Assessment [59.37 mb]
Onondaga Lake Wetlands/ Floodplain Assessment - March 2010
- 2002 DECEMBER - BASELINE ECOLOGICAL RISK ASSESSMENT (BERA)
- 2. CITIZEN PARTICIPATION PLAN
- 2009 March - Citizen Participation Plan (CPP) [1.02 mb]
Onondaga Lake Citizen Participation Plan (CPP) for the Remedial Design Program - March 2009 - 2011 April - Cultural Resource Mgmt Rpt Phase 1B Reconnaissance Survey Onondaga Lake, Slurry Pipeline [86.68 mb]
Cultural Resource Management Report Phase 1B Reconnaissance Survey Onondaga Lake Project, Upland and Shoreline Area Slurry Pipeline & Fiber Optic Line, April 12, 2011 - 2011 July - Cultural Resource Mgmt Report Phase 1 Reconnaissance Survey [21.73 mb]
Cultural Resource Mgmt Report Phase 1 Reconnaissance Survey, Onondaga Lake Project, Upland and Shoreline Area, Lakeshore Complex, July 26, 2011 - 2011 Oct - Final Phase 1B Underwater Archaeological Report for the Onondaga Lake Bottom [21.06 mb]
Final Phase 1B Underwater Archaeological Report for the Oondaga Lake Bottom, October 2011 - 2014 Sept - Phase 3 Underwater Archaeological Rpt for the OL Bottom [38.26 mb]
Phase 3 Underwater Archaeological Report for the Onondaga Lake Bottom, September 2014 - 2016 Nov - Phase 3 Underwater Archaeological Doc of A13 [5.45 mb]
Phase 3 Underwater Archaeological Documentation of Anomaly 13, (A13), Nov 2016
- 2009 March - Citizen Participation Plan (CPP) [1.02 mb]
- 3. HABITAT PLAN
- 2009 December - Remedial Design Elements for Habitat Restoration [31.22 mb]
Remedial Design Elements for Habitat Restoration, December 2009 - 2012 June - Onondaga Lake Habitat and Biological Monitoring Work Plan for 2012 [570 kb]
Onondaga Lake Habitat and Biological Monitoring Work Plan for 2012 - June 2012
- 2009 December - Remedial Design Elements for Habitat Restoration [31.22 mb]
- 4. DESIGN & CONSTRUCTION
- 2009 AUGUST - SCA CIVIL AND GEOTECHNICAL IDS
- Onondaga Lake SCA Civil & Geotechnical IDS - Appendices H thru N - August 2009 [14.67 mb]
Onondaga Lake Sediment Consolidation Area (SCA) CIvil and Geotechnical Initial Design Submittal - Appendices H thru N - August 2009 - Onondaga Lake SCA Civil and Geotechnical IDS - Text - August 2009 [5.68 mb]
Onondaga Lake Sediment Consolidation Area (SCA) Civil and Geotechnical Initial Design Submittal - Text, Table, & Figures - August 2009 - SCA Civil & Geotechnical IDS - Appendices D thru G - August 2009 [18.46 mb]
Onondaga Lake Sediment Consolidation Area (SCA) Civil and Geotechnical Initial Design Submittal - Appendices D thru G - August 2009 - SCA Civil and Geotechnical IDS - Appendices A thru C - August 2009 [25.95 mb]
Onondaga Lake Sediment Consolidation Area (SCA) Civil and Geotechnical Initial Design Submittal - Appendices A thru C - August 2009
- Onondaga Lake SCA Civil & Geotechnical IDS - Appendices H thru N - August 2009 [14.67 mb]
- 2009 DECEMBER - DRAFT ONONDAGA LAKE CAPPING & DREDGE AREA & DEPTH IDS
- APPENDIX C - GROUNDWATER UPWELLING EVALUATION
- Appendix C - GW Full Attachments 12-08 [10.89 mb]
Last modified on 2009-12-29 - Appendix C - GW Report Dec 8 [6.68 mb]
Last modified on 2009-12-29
- Appendix C - GW Full Attachments 12-08 [10.89 mb]
- APPENDIX E - CAP-INDUCTED SETTLEMENT EVALUATION
- Appendix E-1 - Cap-Induced Settlement Evaluation [10.48 mb]
Last modified on 2009-12-29 - Appendix E-2 - Cap-Induced Settlement Evaluation for Remediation Area D [2.03 mb]
Last modified on 2009-12-29
- Appendix E-1 - Cap-Induced Settlement Evaluation [10.48 mb]
- APPENDIX H - STABILITY EVALUATION OF REMEDIATION AREA D
- Appendix H - Summary [669 kb]
Last modified on 2009-12-29 - H-2 - Liquefaction Potential Analyses [1.03 mb]
Last modified on 2009-12-29 - H-3 - Static Slope Stability Analyses [4.42 mb]
Last modified on 2009-12-29 - H-4 - Seismic Slope Stability Analyses [4.56 mb]
Last modified on 2009-12-29 - H.1 - Summary of Subsurface Stratigraphy and Material Properties (Data Pkg) [1.12 mb]
Last modified on 2009-12-29
- Appendix H - Summary [669 kb]
- APPENDIX I - PH AMENDMENT EVALUATION
- I.1 - Cap pH Model Memo [820 kb]
Last modified on 2009-12-29 - I.2 - Siderite Leachate Evaluation [127 kb]
Last modified on 2009-12-29
- I.1 - Cap pH Model Memo [820 kb]
- Appendix A - Remedial Area Delineation [1.17 mb]
Last modified on 2009-12-29 - Appendix B - Cap Modeling [2.87 mb]
Last modified on 2009-12-29 - Appendix D - Erosion Protection Layer - Armor Layer Design [4.93 mb]
Last modified on 2009-12-29 - Appendix F - Dredging Plans [15.03 mb]
Last modified on 2009-12-29 - Appendix G - ILWD Removal Aproach Supporting Information [14.6 mb]
Last modified on 2009-12-29 - Draft Onondaga Lake Cappind & Dredge Area & Depth IDS [21.34 mb]
Draft Onondaga Lake Capping and Dredge Area and Depth Initial Design Submittal (IDS) - Text, Tables & Figures - December 2009, Last modified on 2009-12-28
- APPENDIX C - GROUNDWATER UPWELLING EVALUATION
- 2010 FEBRUARY - DRAFT SEDIMENT MANAGEMENT INTERMEDIATE DESIGN
- 2010 February - Draft Sediment Management Intermediate Design [3.77 mb]
Onondaga Lake Draft Sediment Management Intermediate Design - Text, Table & Figure - February 2010 - Appendix A - Lake Sediment Physical Characteristics & Geotechnical Properties [96 kb]
Appendix A - Lake Sediment Physical Characteristics & Geotechnical Properties, 2-10 - Appendix B - Dredge Productivity Calculations [48 kb]
Appendix B - Dredge Productivity Calculations, 2-10 - Appendix C - Wet Weather Shutdown Statistical Analysis [174 kb]
Appendix C - Wet Weather Shutdown Statistical Analysis - 2-10 - Appendix D - Intermediate Design Drawings [30.2 mb]
Appendix D - Intermediate Design Drawings, 2-10 - Appendix E - Slurry Pipeline Wetland Delineation Memo [4.51 mb]
Appendix E - Slurry Pipeline Wetland Delineation Memo, 2-10 - Appendix F - Conveyance System Headloss Calculation [494 kb]
Appendix F - Conveyance System Headloss Calculation, 2-10 - Appendix G - Wastestream Technologies Phase IV Addendum 6 Summary Report [531 kb]
Appendix G - Wastestream Technologies Phase IV Addendum 6 Summary Report, 2-10 - Appendix H - Mineral Processing Services Phase IV Addendum 6 Summary Report [5.02 mb]
Appendix H - Mineral Processing Services Phase IV Addendum 6 Summary Report, 2-10 - Appendix I - Mass Balance Calculations [413 kb]
Appendix I - Mass Balance Calculations, 2-10
- 2010 February - Draft Sediment Management Intermediate Design [3.77 mb]
- 2010 JANUARY - DRAFT SCA CIVIL AND GEOTECHNICAL FINAL DESIGN
- APPENDIX E - DRAWINGS AND SPECIFICATIONS
- Appendix E - Drawings [11.01 mb]
Last modified on 2010-01-25 - Appendix E - Specifications [1.83 mb]
Last modified on 2010-01-25
- Appendix E - Drawings [11.01 mb]
- APPENDIX K - OPERATIONS & FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN
- Appendix K-1 - Design of Surface Water Management System for Operational Conditions [2.37 mb]
Last modified on 2010-01-26 - Appendix K.2 - Final Cover System Surface Water Management System Design [2.75 mb]
Last modified on 2010-01-26
- Appendix K-1 - Design of Surface Water Management System for Operational Conditions [2.37 mb]
- 2010 January - Draft SCA Civil & Geotechnical Final Design [3.17 mb]
Onodaga Lake Draft Sediment Consolidation Area (SCA) Civil and Geotechnical Final Design - Text, Tables & Figures - January 2010 - Appendix A - SCA Civil & Geotechnical Memorandum [17.55 mb]
Appendix A - SCA Civil & Geotechnical Memorandum, January 2010 - Appendix B - SCA Dewatering Evaluation [664 kb]
Appendix B - SCA Dewatering Evaluation, January 2010 - Appendix C - Compatibility Test Results [21.37 mb]
Appendix C - Compatibility Test Results, January 2010 - Appendix D - Direct Shear Interface Test Results [478 kb]
Appendix D - Direct Shear Interface Test Results, January 2010 - Appendix F - Volume Calculations for SCA Design [3.34 mb]
Appendix F - Volume Calculations for SCA Design, January 2010 - Appendix G - Slope Stability Analyses for SCA Design [5.5 mb]
Appendix G - Slope Stability Analyses for SCA Design, January 2010 - Appendix H - Settlement Analyses for SCA [8.48 mb]
Appendix H - Settlement Analyses for SCA, January 2010 - Appendix I - Evaluation of Hydraulic Performance for SCA Design [1.84 mb]
Appendix I - Evaluation of Hydraulic Performance for SCA Design, January 2010 - Appendix J - Sump and Riser Calculations for SCA Design [1.96 mb]
Appendix J - Sump and Riser Calculations for SCA Design, January 2010 - Appendix L - Final Cover Veneer Stability Analyses for SCA Design [939 kb]
Appendix L - Final Cover Veneer Stability Analyses for SCA Design, January 2010 - Appendix M - Construction Quality Assurance Plan [319 kb]
Appendix M - Construction Quality Assurance Plan, January 2010 - Appendix N - Geotechnical Instrumentation and Monitoring Plan [143 kb]
Appendix N - Geotechnical Instrumentation and Monitoring Plan, January 2010 - Appendix O - Post-Closure Care Plan [250 kb]
Appendix O - Post-Closure Care Plan, January 2010
- APPENDIX E - DRAWINGS AND SPECIFICATIONS
- 2011 APRIL - ONONDAGA LAKE SCA CIVIL AND GEOTECHNICAL FINAL DESIGN
- 2011 April - Onondaga Lake SCA Civil and Geotechnical Final Design [2.53 mb]
Onondaga Lake Sediment consilidation Area (SCA) Civil and Technical Final Design, Text, Tables and Figures - April 2011 - Appendix A - Sediment Consolidation Area (SCA) Civil and Geotechnical Technical Memorandum [17.52 mb]
- Appendix B - Sediment Consolidation area (SCA) Dewatering Evaluation [664 kb]
- Appendix C - Compatibility Test Results [21.37 mb]
- Appendix D - Direct Shear Interface Test Results [477 kb]
- Appendix E - Drawings and Specifications [3.38 mb]
- Appendix F - Volume Calculations for SCA Design [3.32 mb]
- Appendix G - Slope Stability Analysis for SCA Design [5.49 mb]
- Appendix H - Settlement Analyses for SCA [16.48 mb]
- Appendix I - Evaluation of Hydraulic Performance for SCA Design [1.64 mb]
- Appendix J - Sump and Riser Calculations for SCA Design [1.41 mb]
- Appendix K - Operations and Final Cover Surface Water Management System Design [2.38 mb]
- Appendix L - will be included in the Closure Design [17 kb]
- Appendix M - Construction Quality Assurance Plan [425 kb]
- Appendix N - Geotechnical Instrumentation and Monitoring Plan [287 kb]
- Will be included in the Closure Report [17 kb]
- 2011 April - Onondaga Lake SCA Civil and Geotechnical Final Design [2.53 mb]
- 2011 APRIL - STORMWATER POLLUTION PREVENTION PLAN
- DEC acceptance letter 4-29-11.pdf [187 kb]
- Part 1 SCA WTP SWPPP Text and Figures.pdf [17.92 mb]
- Part 2 SCA WTP SWPPP Contract Dwgs.pdf [29.83 mb]
- Part 3 SCA WTP SWPPP Sediment Mgmt Design Dwgs.pdf [25.61 mb]
- Part 4 SCA WTP SWPPP Appendices.pdf [15.49 mb]
- Trans ltr to DEC from Honeywell 4-13-11.pdf [150 kb]
- 2011 JAN - DRAFT ONONDAGA LAKE CAPPING, DREDGING AND HABITAT INTERMEDIATE DESIGN
- APPENDIX A - REMEDIAL AREA DELINEATION
- APPENDIX B - CAP MODELING
- FIGURES B-12 THROUGH B-55
- B-12_Rem_A_Mercury.pdf [337 kb]
- B-13_Rem_A_Benzene.pdf [328 kb]
- B-14_Rem_A_Toluene.pdf [334 kb]
- B-15_Rem_A_Ethylbenzene.pdf [330 kb]
- B-16_Rem_A_TXylenes.pdf [341 kb]
- B-17_Rem_A_Chlorobenz.pdf [339 kb]
- B-18_Rem_A_Total_DCB.pdf [346 kb]
- B-19_Rem_A_Total_TCB.pdf [360 kb]
- B-20_Rem_A_Nephalene.pdf [333 kb]
- B-21_Rem_A_calc_Phenol.pdf [374 kb]
- B-22_Rem_A_MaxSedpH.pdf [667 kb]
- B-23_Rem_B_PW_mercury.pdf [228 kb]
- B-24_Rem_B_PW_benz.pdf [193 kb]
- B-25_Rem_B_PW_toluene.pdf [192 kb]
- B-26_Rem_B_PW_ethylb.pdf [195 kb]
- B-27_Rem_B_PW_tot_xylene.pdf [191 kb]
- B-28_Rem_B_PW_chlorobenz.pdf [191 kb]
- B-29_Rem_B_PW_tot_DCB.pdf [191 kb]
- B-30_RemB_PW_tot_TCBs.pdf [224 kb]
- B-31_Rem_B_PW_naphth.pdf [192 kb]
- B-32_Rem_B_PW_calc_phenol.pdf [254 kb]
- B-33_Rem_B_MaxSedpH.pdf [467 kb]
- B-34_Rem_C_PW_mercury.pdf [228 kb]
- B-35_Rem_C_PW_benz.pdf [266 kb]
- B-36_Rem_C_PW_toluene.pdf [228 kb]
- B-37_Rem_C_PW_ethylb.pdf [269 kb]
- B-38_Rem_C_PW_tot_xyl.pdf [230 kb]
- B-39_Rem_C_PW_chlorob.pdf [263 kb]
- B-40_Rem_C_PW_tot_DCB.pdf [270 kb]
- B-41_Rem_C_PW_tot_TCBs.pdf [262 kb]
- B-42_Rem_C_PW_naphth.pdf [226 kb]
- B-43_Rem_C_PW_calc_phenol.pdf [257 kb]
- B-44_Rem_C_MaxSedpH.pdf [627 kb]
- B-45_Rem_E_PW_mercury.pdf [332 kb]
- B-46_Rem_E_PW_benz.pdf [360 kb]
- B-47_Rem_E_PW_toluene.pdf [353 kb]
- B-48_Rem_E_PW_ethylbnz.pdf [355 kb]
- B-49_Rem_E_PW_tot_xylenes.pdf [357 kb]
- B-50_Rem_E_PW_chlorobenz.pdf [366 kb]
- B-51_Rem_E_PW_tot_DCB.pdf [365 kb]
- B-52_Rem_E_PW_tot_TCBs.pdf [345 kb]
- B-53_Rem_E_PW_naphth.pdf [363 kb]
- B-54_Rem_E_PW_calc_phenol.pdf [350 kb]
- B-55_Rem_E_MaxSedpH.pdf [880 kb]
- Appendix B - Cap Modeling - Text [2.99 mb]
- Attachment 5 - Cap Model Files AQ 20110118 [138 kb]
- Attachment 1 - Model Input [136 kb]
- Attachment 2 - Paritioning Coefficients and Sediment to Porewater Calculation Basis [1.2 mb]
- Attachment 3 - Model Validation [872 kb]
- Attachment 4 - Glaza Memo Biotrubation 10-14-11 [239 kb]
- FIGURES B-12 THROUGH B-55
- APPENDIX C - GROUNDWATER UPWELLING EVALUATION
- Appendix C - Groundwater Upwelling Evaluation [5.65 mb]
- Attachments I through XII [11.68 mb]
- APPENDIX D - EROSION PROTECTIO NLAYER EVALUATION
- APPENDIX E - CAP-INDUCED SETTLEMENT EVALUATION
- Appendix E.1 - Cap Settlement [10.68 mb]
- Appendix E.2 Cap Settlement RA D and Outboard [4.29 mb]
- APPENDIX F - DREDGE AND CAP DESIGN PLANS
- APPENDIX G - ILWD DREDGE AREA AND DEPTH DEVELOPMENT
- Appendix G - ILWD Dredge Area and Depth Development [25.11 mb]
- Figures G-1 to G-30 [25.03 mb]
- APPENDIX H - ILWD GEOTECHNICAL STABILITY EVALUATION
- Appendix H - ILWD Geotechnical Stability Evaluaiton [673 kb]
- Attachment H.1 - Data Package [4.03 mb]
- Attachment H.2 - Liquefaction [1.23 mb]
- Attachment H.3 - Static Stability [907 kb]
- Attachment H.4 - Seismic Stability [867 kb]
- APPENDIX I - PH AMENDMENT EVALUATION
- 2011 Jan - Draft Onondaga Lake capping, Dredging and habitat Intermediate Design - Figures [26.33 mb]
Figures - 2011 Jan - Draft Onondaga Lake Capping, Dredging and Habitat Intermediate Design - Tables [212 kb]
Tables - 2011 Jan - Draft Onondaga Lake Capping, Dredging and Habitat Intermediate Design - Text [1.38 mb]
Draft Onondaga Lake Capping, Dredging and Habitat Intermediate Design, Text - January 2011 - Appendix J - Dredge and Capping Equipment Selection and Production Rates [678 kb]
- 2011 SEPTEMBER - ONODAGA LAKE SEDIMENT MANAGEMENT FINAL DESIGN
- APPENDIX A - FINAL DESIGN DRAWINGS AND SPECIFICATIONS
- DRAWINGS
- Basin Design Drawings - Rev0 - Sealed (pkg).pdf [5.92 mb]
- Drawings Parsons Pkg [34.89 mb]
- SPECIFICATIONS
- Appendix A - Specifications [566 kb]
- DRAWINGS
- 2011 September - Onondaga Lake Sediment Mgmt Final Design [2.49 mb]
Onondaga Lake Sediment Management Final Design, Text, Tables and Figure - September 2011 - Appendix B - Slurry Pipeline Wetland Delineation Memo [157 kb]
- Appendix C - Conveyence System Headloss Calculations [1.91 mb]
- Appendix D - Mineral Processing Services Phase IV Addendum 6 SUmmary Report [4.83 mb]
- Appendix F - Lake Sediment P hysical Characteristics and Geotechnical Properties [43 kb]
- Appendix G - SCA Basin Calculations [10.04 mb]
- Appendix H - Construction Quality Assurance Plan [399 kb]
- Appendix I - Operations Guidelines [183 kb]
- Appendix R - Mass Balance Calculations [604 kb]
- APPENDIX A - FINAL DESIGN DRAWINGS AND SPECIFICATIONS
- 2012 MARCH - ONONDAGA LAKE CAPPING, DREDGING, HABITAT AND PROFUNDAL ZONE (SMU 8) FINAL DESIGN
- 2012 March - Figures [64.05 mb]
- 2012 March - OL Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design [2.11 mb]
OL Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design - March 2012 - 2012 March - Report Tables [1.07 mb]
- Appendix A - Remedial Area Delineation [2.93 mb]
- Appendix B - Cap Modeling [3.67 mb]
- Appendix C - Groundwater Upwelling Evaluation [17.91 mb]
- Appendix D - Erosion Protection Layer Evaluation [7.06 mb]
- Appendix E - Cap-Induced Settlement Evaluation [14.37 mb]
- Appendix F - Dredge and Cap Design Plans (Sealed Drawings) [56.17 mb]
- Appendix G - In-Lake Waste Deposit Removal Approach Supporting Information [14.96 mb]
- Appendix H - Stability Evaluation of Remediation Area D Onondaga Lake Bottom Subsite [17.51 mb]
- Appendix I - Cap pH Amendment Evaluation [1.96 mb]
- Appendix J - Dredge and Capping Equipment Selection and Production Rates [953 kb]
- Appendix K - Habitat [31.96 mb]
- Appendix L - Cap Material Specifications [1.13 mb]
- Appendix M - MNR Modeling [2 mb]
- Appendix N - BSQV [986 kb]
- 2012 OCT - OL PHASE I- SCA CONSTRUCTION CQAP FINAL REPORT
- 2012 Oct - OL Phase I - SCA Construction, CQAP [17.47 mb]
Onondaga Lake Bottom Phase I - Sediment Consolidation Area Construction, Constrution Quality Assurance Final Report, Text, App A thru C, October 2012 - Appendix D [10.53 mb]
- Appendix E thru Appendix F [16.61 mb]
- Appendix G thru Appendix J [8.67 mb]
- Appendix K thru Appendix O [28.95 mb]
- 2012 Oct - OL Phase I - SCA Construction, CQAP [17.47 mb]
- 2015 APRIL - ONONDAGA LAKE SCA FINAL COVER DESIGN REPORT FOR 2015 CONSTRUCTION
- APPENDIX B - DESIGN DRAWINGS
- Cover Sheet [5.09 mb]
- Final Cover System Details I [6.99 mb]
- Final Cover System Details II [5.37 mb]
- Geotechnical Instrumentation Abandonment Plan [7.59 mb]
- Site Layout Plan [9.71 mb]
- Top of Geotextile Tubes Plan [8.84 mb]
- Top of Leveling Layer Grading Plan [8.53 mb]
- 2015 April - OL SCA Final Cover Design Report 2015 Construction [2.4 mb]
Onondaga Lake SCA Final Cover Design Report 2015 Construction, Text, Figures - April 2015 - Appendix A - Design Evaluations [22.18 mb]
- Appendix C - Specifications [1000 kb]
- Appendix D - CQAP [429 kb]
- APPENDIX B - DESIGN DRAWINGS
- 2016 MAY - ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA (SCA) FINAL COVER DESIGN REPORT
- APPENDIX A - DESIGN CALCS
- A-1_SETTLEMENT ANALYSES
- A-1_addendum 1_Settlement Reevaluation.pdf [1.65 mb]
- A-1_addendum 2_Settlement Reevaluation.pdf [2.58 mb]
- A-1_Settlement Analysis.pdf [10.88 mb]
- A-10_VEGETATIVE COVER
- A-10_Vegetative Soil Layer.pdf [5.05 mb]
- A-2_VOLUME CALCULATIONS
- A-2_addendum 1_Volume Package.pdf [262 kb]
- A-2_Volumes Package.pdf [3.68 mb]
- A-3_HELP
- A-3_ HELP.pdf [1.34 mb]
- A-4_MAX ALLOWABLE GAS PRESSURE
- A-4_Max Allowable Gas Pressure.pdf [239 kb]
- A-5_VENEER
- A-5_Veneer.pdf [1.01 mb]
- A-6_STABILITY
- A-6_Stability.pdf [8.88 mb]
- A-7_GAS MANAGEMENT
- A-7_Gas Management System.pdf [720 kb]
- A-8_SUMP AND RISER
- A-8_Sump and Riser.pdf [616 kb]
- A-9_STORMWATER
- A-9_Stormwater .pdf [6.11 mb]
- A-1_SETTLEMENT ANALYSES
- APPENDIX D - CQAP
- Appendix D - CQAP.pdf [388 kb]
- Appendix D, addendum 1 - CQA Plan.pdf [110 kb]
- Appendix B_Design Drawings.pdf [127.09 mb]
- Appendix C_Specifications.pdf [2.25 mb]
- Appendix E_PCCP.pdf [13 kb]
- Appendix F_Field Change Forms.pdf [11.7 mb]
- SCA Final Design Report 05 2016.pdf [1.52 mb]
- APPENDIX A - DESIGN CALCS
- 2008 May - Air Dispersion Modeling Protocol [1.09 mb]
Onondaga Lake Air Dispersion Modeling Protocol - May 2008 - 2009 February - SCA Dewatering Evaluation [624 kb]
Onondaga Lake Sediment Consolidation Area (SCA) Dewatering Evaluation - February 2009 - 2009 March - Remedial Design Work Plan [4.21 mb]
Onondaga Lake Remedial Design Work Plan, March 2009 - 2009 October - SCA WTP Intermediate Design Submittal rev 10_8 [17.11 mb]
Onondaga Lake Remedial Design - SCA WTP Intermediate Design Submittal dated October 8, 2009 - O'brien & Gere - 2010 August - Pollution Prevention Plan [6.57 mb]
Onondaga Lake - Stormwater Pollution Prevention Plan - Water Treatment Plant and Sediment Consolidation Area - August 2010 - - 2010 July - Water Treatment Plant Preloading & SCA 2010 Construction CHASP [1.33 mb]
Onondaga Lake Water Treatment Plant Preloading and Sediment Consolidation Area 2010 Construction - Community Health & Safety Plan, July 2010 - 2010 June - Water Treatment Plant Preloading and SCA 2010 Construction WP [434 kb]
Onondaga Lake Water Treatment Plant Preloading and Sediment Consolidation Area 2010 Construction Work Plan, June 2010 - 2010 March Remedial Design SCA Water Treatment Plant DP #1 [38.44 mb]
Onondaga Lake Remedial Design SCA Water Treatment Plant - Design Package #1 - Process Submittal, March 2010 - 2010 May Remedial Design SCA Water Treatment Plant DP #2 [35.1 mb]
Onondaga Lake Remedial Design SCA Water Treatment Plant - Draft Design Package DP #2 - May 2010 - 2010 November - Draft IDS for the Onondaga Lake Profundal Zone (SMU 8) [5.8 mb]
Draft Initial Design Submittal for the Onondaga Lake Profundal Zone (SMU 8) 0 November 2010 - 2010 October - SCA DP#3 Final Design [57.31 mb]
Onondaga Lake - Remedial Design SCA Water Treatment Plant - Design Package (DP) #3 Technical Specifications - October 2010 - 2010 September Remedial Design SCA Water Treatment Plant - DP #3 [279.58 mb]
Onondaga Lake Remedial Design SCA Water Treatment Plan - Draft Design Package (DP) #3 Technical Specifications, September 2010 - 2011 Aug - Phase 1 Pump Station and 6-inch Force Main, Onondaga Lake Upland Project [10.1 mb]
Phase 1 Pump Station and 6-inch Force Main, Onondaga Lake Upland Project, August 25, 2011 - 2011 February - 30 & 24 Inch Force Main Rehab Ltr, Design Dwgs, & Specs [5.77 mb]
30" and 24" Force Main Rehabilitation for the Onondaga Lake Mercury Sediments Site - Ltr, Design Dwgs, & Specs - February 2011 - 2011 Jan - 2011-12 Construction Community H&S Plan [2.54 mb]
Onondaga Lake 2011-2012 Construction Community Health and Safety Plan, January 2011 - 2011 June - I690 Storm Drainage System - State Fair Blvd Drainage Ditch Samp WP [2 mb]
OL - I690 Storm Drainage System - State Fair Blvd Drainage Ditch Samp WP - June 2011 - 2011 June - I690 Storm Drainage System Flow Monitoring & Sample Work Plan [2.56 mb]
OL - I690 Storm Drainage System Flow Monitoring & Sample Work Plan - June 2011 - 2011 Nov - Final Honeywell Groundwater Flow Model, version 3 [12.64 mb]
Final Honeywell Groundwater Flow Model, Version 3 - November 2011 - 2011 Nov - Geotechnical Instrumentation Installation Rpt - 2010 and 2011 SCA [35.2 mb]
Geotechnical Instrumentation Installation Rpt - 2010 and 2011 SCA - November 2011 - 2011 Oct - Cultural Resource Investigation, Slurry Pipeline [6.53 mb]
Cultural Resource Investigation, Slurry Pipeline from Station 136+89 to Station 145+86, October 2011 - 2011 Oct - Onondaga Lake Siderite Column Data Report [949 kb]
Onondaga Lake Siderite Column Studies Data Report, October 2011 - 2011 October - 30 & 24 Force Main Rehab Ph 1 WP [16.08 mb]
Onondaga Lake 30 & 24 Force Main Rehabilitation Phase 1 Work Plan dated October 26, 2011 - 2011 October - Onondaga Lake Capping Field Demonstration Work Plan [1.51 mb]
Onondaga Lake Capping Field Demonstration Work Plan, October 2011 - 2012 April - Onondaga Lake PDI Phase VI GAC Adsorption Isotherm Study Final Report [4.17 mb]
Onondaga Lake Pre-Design Investigation Phase VI GAC Adsorption Isotherm Study Final Report - April 2012 - 2012 Aug - Capping Calibration Work Plan [825 kb]
Capping Calibration Work Plan, August 2012 - 2012 Aug - Final Construction Quality Assurance Plan [4.91 mb]
Final CQAP August 2012 - 2012 Aug - Report for the First Year of the Nitrate Addition Pilot Test in the Hypolimnion of Onondaga Lake [6.64 mb]
Report for the First Year of the Nitrate Addition Pilot Test in the Hypolimnion of Onondaga Lake, August 2012 - 2012 Jan - Onon Lake Earthen Materials Invest. WP Granby Quarry Invest. [9.26 mb]
Oondaga Lake Site Earthen Materials Investigation Work Plan Granby Quarry Investigation - January 2012 - 2012 June - Onondaga Lake Tissue Monitoring Work Plan for 2012 [753 kb]
Onondaga Lake Tissue Monitoring Work Plan for 2012 - June 2012 - 2012 June - Quality Assurance Project Plan, Air Quality Monitoring Program - OL Dredging, Sediment Management and Water Treatment [4.68 mb]
Onondaga Lake AQM QAPP - June 2012 - 2012 May - Addendum1 (2012) to WP for Pilot Test to Add Nitrate to the Hypolimnionof Onondaga Lake [285 kb]
Addendum1 (2012) to WP for Pilot Test to Add Nitrate to the Hypolimnionof Onondaga Lake - May 2012 - 2012 May - Onondaga Lake Remediation Operations Community Health and Safety Plan (CHASP) [2.58 mb]
Onondaga Lake Remediation Operations Community Health and Safety Plan (CHASP) - May 2012 - 2012 May - Onondaga Lake Sediment Managerment Final Design Addendum 1 [3.09 mb]
Onondaga Lake Sediment Management Final Design Addendum 1 - May 2012 - 2012 May - Water Quality Mgmt and Monitoring Plan Onondaga Lake [19.77 mb]
Water Quality Mgmt and Monitoring Plan Onondaga Lake - May 2012 - 2012 Oct - Constr Quality Assurance Final Rpt, SMS Basins, SCA, OL Bottom Subsite Remedial Design [41.21 mb]
Constr Quality Assurance Final Rpt, SMS Basins, SCA, OL Bottom Subsite Remedial Design, Oct 2012 - 2012 Oct - Onondaga Lake Granby Quarry Investigation Data Summary Report [13.48 mb]
Onondaga Lake Granby Quarry Investigation Data Summary Report - October 2012 - 2013 April - Onondaga Lake Phase II SCA Construction, Construction QA Final Report [52.49 mb]
Onondaga Lake Phase II - Sediment Consolidation Area Construction, Construction Quality Assurance Final Report, April 2013 - 2013 April - Onondaga Lake Sediment Management Winter 2013 Additional Odor Mitigation Plan [2.58 mb]
Onondaga Lake Sediment Management Winter 2013 Additional Odor Mitigation Plan -April 2013 - 2013 Aug - OL Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design Cap Sampling Port Addendum [1.52 mb]
Onondaga Lake Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design Cap Sampling Port Addendum - August 2013 - 2013 August - Onondaga Lake Tissue and Biological Monitoring Report for 2012 [3.2 mb]
Onondaga Lake Tissue and Biological Monitoring Report for 2012 - August 2013 - 2013 Dec - 2012 and 2013 Source Control Summary for the Onondaga Lake Bottom Subsite [1.31 mb]
2012 and 2013 Source Control Summary for the Onondaga Lake Bottom Subsite- December 2013 - 2013 Dec - Capping Field Demonstration Summary Report [10.94 mb]
Capping Field Demonstration Summary Report - December 2013 - 2013 Feb Odor Characterization Sampling and Analysis Plan [839 kb]
Odor Characterization Sampling and Analysis Plan Feb 2013 - 2013 Jan - Mitigation Plan for Archaeological Properties in the Onondaga Lake Bottom [536 kb]
Mitigation Plan for Archaeological Properties in the Onondaga Lake Bottom - January 23, 2013 - 2013 July - Addendum 1 (2013) to Onondaga Lake Tissue Monitoring Work Plan for 2012 [69 kb]
Addendum 1 (2013) to Onondaga Lake Tissue Monitoring Work Plan for 2012 - July 2013 - 2013 July Onondaga Lake Remediation Real-Time Benzene Monitoring Evaluation Plan [5.46 mb]
Onondaga Lake Remediation Real-Time Benzene Monitoring Evaluation Plan July 2013 - 2013 Jun - Addendum 2 (2013) to WP for Pilot Test to Add Nitrate to the Hypolimnion of OL [184 kb]
Addendum 2 (2013) to Work Plan for Pilot Test to Add Nitrate to the Hypolimnion of Onondaga Lake, June 2013 - 2013 November Real-Time Benzene Monitoring Evaluation Results [1.51 mb]
Real-Time Benzene Monitoring Evaluation Results November 2013 - 2013 Oct - Thickener Sampling Plan [249 kb]
Thickener Sampling Plan - October 2013 - 2013 October SCA West Basin - Design and Operational Plan [7.52 mb]
SCA West Basin - Design and Operational Plan October 2013 - 2013 Sept - 2011 Onondaga Lake Baseline Monitoring Report [6.15 mb]
2011 Onondaga Lake Baseline Monitoring Report - Sept 2013 - 2013 Sept - Second Yr of the Nitrat Addition Pilot Test in the Hypolimnion of Onondaga Lake (2012) [16.64 mb]
Second Yr of the Nitrat Addition Pilot Test in the Hypolimnion of Onondaga Lake (2012) - Sept 2013 - 2013 September OL SCA/SCA WTP SWPPP Modification.pdf [4.61 mb]
OL SCA/SCA WTP SWPPP Modification September 2013 - 2014 April Final_TVOC Investigate Level Procedure to Resp.pdf [1.39 mb]
Final Procedure for Response to TVOC Investigate Level Exceedances - 2014 Aug - OL Capping, Dredging, Habitat and SMU 8 Final Design Onondaga Creek Navigational Channel Design Addendum [1.92 mb]
Onondaga Lake Capping, Dredging, Habitat and SMU 8 Final Design Onondaga Creek Navigational Channel Design Addendum - August 2014 - 2014 August - O&M Plan for Adding Nitrate Full Scale to the Hypolimnion of OL [6.5 mb]
Operations and Monitoring Plan for Adding Nitrate Full Scale to the Hypolimnion of Onondaga Lake - August 2014 - 2014 Dec - Rev Hydrogeologic Investigation to Support GW Monitoring at the Sediment Consolidation Area [43.17 mb]
Rev Hydrogeologic Investigation to Support GW Monitoring at the Sediment Consolidation Area Dec 2014 - 2014 Dec - Rev Sediment Consolidation Area (SCA) Environmental Monitoring Plan [4.83 mb]
Rev Sediment Consolidation Area (SCA) Environmental Monitoring Plan - Dec 2014 - 2014 Jan - Work Plan for Baseline Monitoring of Sediment Resuspension along the WB 1-8 Shoreline of Onondaga Lake [1.64 mb]
Work Plan for Baseline Monitoring of Sediment Resuspension along the WB 1-8 Shoreline of Onondaga Lake - January 2014 - 2014 Jan Supplemental Treatment and Lake Discharge Design, Construction, and Operations Work Plan [3.07 mb]
Supplemental Treatment and Lake Discharge Design, Construction, and Operations Work Plan Jan 2014 - 2014 July - Addendum 2 (2014) to Onondaga Lake Tissue Monitoring Work Plan for 2012 [128 kb]
Addendum 2 (2014) to Onondaga Lake Tissue Monitoring Work Plan for 2012 - July 2014 - 2014 July - OL RA E Shoreline Technical Support Document [7.68 mb]
Onondaga Lake Remediation Area A E Shoreline Technical Support Document, July 2014 - 2014 June - Construction Summary Report Onondaga Lake through 2013 [7.2 mb]
Construction Summary Report Onondaga Lake through 2013 - June 2014 - 2014 June - Onondaga Lake Technical Support Document for Nitrate Addition [792 kb]
Onondaga Lake Technical Support Document for Nitrate Addition - June 2014 - 2014 June - Report for the Third Year of the Nitrate Addition Pilot Test (20130 in the Hypolimnion of Onondaga Lake [14.49 mb]
Report for the Third Year of the Nitrate Addition Pilot Test (20130 in the Hypolimnion of Onondaga Lake, June 2014 - 2014 June Onondaga Lake Bottom Site - Supplemental Treatment and Lake Discharge Completion Report, HW SCA WTP [5.8 mb]
2014 June Onondaga Lake Bottom Site - Supplemental Treatment and Lake Discharge Completion Report, HW SCA WTP June 2014 - 2014 May Rev Plan Add 7 Compounds to VOC List 5_13_14.pdf [2.62 mb]
Revised Proposed Plan to Add 7 Compounds to Speciated VOC List - Air Quality Monitoring Program - May 5, 2014 - 2014 Oct - OL Capping, Design, Habitat and SMU 8 Final Design Metro Outfall Vicinity Design Addendum [9.75 mb]
Onondaga Lake Capping, Design, Habitat and SMU 8 Final Design Metro Outfall Vicinity Design Addendum - October 2014 - 2014 Oct - 2014 Source Control Summary for the OL Bottom Subsite [10.7 mb]
2014 Source Control Summary for the Onondaga Lake Bottom Subsite - October 2014 - 2014 Oct - Dredge and Dewatering System Decommissioning [557 kb]
Dredge and Dewatering System Decommissioning, October 2014 - 2014 Oct - OL SMU 8 Microbead Marker Placement Rpt [4.75 mb]
Onondaga Lake SMU 8 Microbead Marker Placement Report - October 2014 - 2014 Oct - Onondaga Lake Baseline Monitoring of Sediment Resuspension Along the WB 1-8 Shoreline [8.57 mb]
Onondaga Lake Baseline Monitoring of Sediment Resuspension Along the WB 1-8 Shoreline - Oct 2014 - 2014 Sept - OL Natural Recovery Monitoring WP for 2014-2015 [3.92 mb]
Onondaga Lake Natural Recovery Monitoring Work Plan for 2014-2015 - Sept 2014 - 2014 SEPT - OL: Cap Porewater Sampling Methods Demo Work Plan [5.51 mb]
Onondaga Lake: Cap Porewater Sampling Methods Demonstration Work Plan - September 2014 - 2015 April - SCA WTP Lake Discharge Operations Plan (Post-Dredging) [3.68 mb]
SCA WTP Lake Discharge Operations Plan (Post-Dredging) - April 2015 - 2015 Aug - Excavation and Rest Plan Borrow Pit [4.19 mb]
Excavation and Rest Plan Borrow Pit. Revised August 2015 - 2015 March - Stormwater Pollution Prevention Plan Water Treatment Plant Sediment Consolidated Area, and Soil Borrow Area [12.69 mb]
Stormwater Pollution Prevention Plan Water Treatment Plant Sediment Consolidated Area, and Soil Borrow Area - March 2015 - 2015 May - Addendum 3 (2015) to OL Tissue Monitoring WP for 2012 [135 kb]
Addendum 3 (2015) to Onondaga Lake Tissue Monitoring Work Plan for 2012 - May 2015 - 2015 Nov - OL Capping, Dredging, Habitat and SMU 8 Final Design Modified Protective Cap RA-B-1 Design Revision [6.8 mb]
Onondaga Lake Capping, Dredging, Habitat and SMU 8 Final Design Modified Protective Cap RA-B-1 Design Revision, November 2015 - 2015 Oct - OL Modified Protective Cap Areas RA-C1 & RA-D1 Mean PECQ Investigation Results [10.35 mb]
Onondaga Lake Modified Protective Cap Areas RA-C1 & RA-D1 Mean PECQ Investigation Results - October 8, 2015 - 2015 Oct - Development of Geotechnical Parameters in Lake Sediments in Onondaga Lake Capping Areas [1.39 mb]
Development of Geotechnical Parameters in Lake Sediments in Onondaga Lake Capping Areas, October 12, 2015 - 2015 Oct - OL Capping, Dredging, Habitat and SMU 8 Final Design, Modified Protective Cap RA-DA Design Revision [5.82 mb]
Onondaga Lake Capping, Dredging, Habitat and SMU 8 Final Design, Modified Protective Cap RA-DA Design Revision, October 2015 - 2016 Apr - OL Baseline Habitat Characterization 2016 WP for the CSX Shoreline are of RA-E [1.19 mb]
Onondaga Lake Baseline Habitat Characterization 20156 Work Plan for the CSX Shoreline Area of Remediation Area E, April 2016 - 2016 April Onon Lake Mod Protec Cap RA-C-1 Design Rev [8.19 mb]
2016 April Onon Lake Mod Protec Cap RA-C-1 Design Rev - 2016 Aug - Construction Summary Report OL through 2014 [1.92 mb]
Construction Summary Report Onondaga Lake Through 2014, August 2016 - 2016 Feb - OL 2014 Monitored Natural Recovery Data Summary Report [6.91 mb]
Onondaga Lake 2014 Monitored Natural Recovery Data Summary Report - February 2016 - 2016 Feb - OL 2015 MNR DSR [7.5 mb]
Onondaga Lake 2014 Monitored Natural Recovery Data Summary Report - February 2016 - 2016 July - Report for the First Year of Full-Scale Nitrate Addition (2014) in the Hypoolimnion of OL [6.9 mb]
Report for the First Year of Full-Scale Nitrate Addition (2014) in the Hypolimnion of Onondaga Lake, July 2016 - 2016 June - OL SMU 8 Final Design WBB-HB Outboard Area Wetland Optimization Design Revision [855 kb]
Onondaga Lake Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design, Wastebed B - Harbor Brook Outboard Area Wetland Optimization Design Revision - June 2016 - 2016 March - Air Quality Monitoring Plan - 2016 SCA Closure Activities [2.33 mb]
Air Quality Monitoring Plan - 2016 SCA Closure Activities - March 2016 - 2016 May - OL Capping, Dredging, Habitat and SMU 8 Final Design Modified Protective Cap RA-C2 Design Revision [6.98 mb]
Onondaga Lake Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design Modified Protective Cap RA-C2 Design Revision, May 2016 - 2016 May - OL Capping, Dredging, Habitat and SMU 8 Final Design Modified Protective Cap RA-D2 Design Revision [5.95 mb]
Onondaga Lake Capping, Dredging, Habitat and Profundal Zone (SMU 8) Final Design Modified Protective Cap RA-D2 Design Revision, May 2016 - 2016 Oct - WP OL Cap Sampling Methods Demonstration [5.44 mb]
Work Plan Onondaga Lake Cap Sampling Methods Demonstration, October 2016 - 2017 Apr - Report for the Second Year of Full-Scale Nitrate Addition (2015) in the Hypolimnion of OL [6.32 mb]
Report for the Second Year of Full-Scale Nitrate Addition (2015) in the Hypolimnion of OL - April 2017 - 2017 Jan - Construction Summary Report OL Through 2015 [1.4 mb]
Construction Summary Report Onondaga Lake Through 2015 - January 2017 - 2017 May - 2015 and 2016 Source Control Summary for the OL Bottom Subsite [23.34 mb]
2015 and 2016 Source Control Summary for the Onondaga Lake Subsite, May 2017
- 2009 AUGUST - SCA CIVIL AND GEOTECHNICAL IDS
- 5. OPERATIONS & MAINTENANCE
- 2014 OCTOBER - OPERATION, MAINTENANCE, AND MONITORING PLAN FOR THE ONONDAGA LAKE LAKESHORE BARRIER WALL HYDRAULIC CONTAINMENT SYSTEM
- APPENDIX A - EQUIPMENT MANUALS
- 1 - COLLECTION TRENCH MANUALS
- a-Pipe.pdf [12 kb]
- b-Sch 80 PVC and Fittings.pdf [3.61 mb]
- c-Wick Drains.pdf [346 kb]
- d-In-Ground Handholes.pdf [1.4 mb]
- e-Air Release Manhole.pdf [227 kb]
- f-Curb Box.pdf [76 kb]
- g-VERSAFLOW MAG TWM 9000 Flow Meter Manual.pdf [2.41 mb]
- h-Rosemount 8700 Magnetic Flow Meter.pdf [1.44 mb]
- 2 - WALL
- A-SHEET PILES
- a-Sheeting Manufacturer's Data.pdf [27 kb]
- b-PilingHandbook.pdf [4.03 mb]
- c-Swellseal.pdf [108 kb]
- B-CORROSION PROTECTION
- a-Cathodic Protection.pdf [768 kb]
- b-Coal Tar Epoxy.pdf [149 kb]
- C-WILLIS TIE BACK
- A-GEOGRID
- 1-Nonwoven Geotextile.pdf [17 kb]
- 2-Geonet.pdf [833 kb]
- 3-Advanedge Pipe.pdf [216 kb]
- 1-Nonwoven Geotextile.pdf [17 kb]
- 2-Geonet.pdf [833 kb]
- 3-Advanedge Pipe.pdf [216 kb]
- b-Tie rod.pdf [469 kb]
- c-Turnbuckles - Couplers.pdf [1.03 mb]
- d-Tie Rod Corrosion Protection.pdf [1.12 mb]
- A-GEOGRID
- A-SHEET PILES
- 3 - INSTRUMENTATION
- A-PIEZOMETERS
- a-Instruction Manual Model 4500 Vibrating Wire Piezometer.pdf [398 kb]
- b-Instruction manual for AVWI and AVW4 vibrating wire piezometer.pdf [880 kb]
- c-AVW200-series 2-Channel Vibrating Wire Spectrum Analyzer Modules.pdf [9.53 mb]
- d-Piezometer Cable.pdf [2.52 mb]
- e-Piezometer Wells Product Data.pdf [2.03 mb]
- f-CR100 baro press sensor.pdf [1.39 mb]
- B-INSTRUMENT PANEL
- A-ELECTRICAL
- a-Instrument Cable.pdf [139 kb]
- b-Nema Junction Boxes and Wireway.pdf [948 kb]
- c-PS100 and CH100 power supply.pdf [736 kb]
- d-Sink source input module.pdf [4.07 mb]
- e-Intrinsic Relay.pdf [763 kb]
- b-CR1000 Measurement and Control System manual.pdf [19.87 mb]
- c-AM 16-32 Multiplexer manual.pdf [813 kb]
- d-MDSiNet wifi reciever.pdf [6.19 mb]
- e-Ether switches Phoenix Contact.pdf [3.65 mb]
- f-Instrumentation photos.pdf [3.15 mb]
- g-MTL5000 ISU.pdf [2.3 mb]
- h-Broadband coaxial protectors.pdf [168 kb]
- i-SC115 CS IO 2G Flash Memory.pdf [442 kb]
- j-cs100 baro press sensor.pdf [1.39 mb]
- A-ELECTRICAL
- A-PIEZOMETERS
- 4 - SUMPS AND PUMPS
- J. VARIABLE DRIVE
- MANUALS
- SCADA SYSTEM [957 kb]
- SCADA SYSTEM [993 kb]
- SCADA SYSTEM [261 kb]
- Yaskawa-1.pdf [17.4 mb]
Image - Yaskawa-2.(reduced).pdf [6.1 mb]
Image
- OM&M Technical Note.pdf [8 kb]
- MANUALS
- a-Pump Specs.pdf [249 kb]
- b-Goulds Pump Manual.pdf [1.3 mb]
- c-Collection Sump Pump Control Panel.pdf [165 kb]
- d-SJE Rhombus Float Switch.pdf [138 kb]
- e-KSR Suspended Float Switches.pdf [1018 kb]
- f-Combination Magnetic Motor Starters.pdf [2.89 mb]
- g-Explosion Proof Plugs and Connectors.pdf [2.73 mb]
- h-GE Druck Submersible Pressure transmitter.pdf [82 kb]
- i-TCI Output Filters.pdf [1.67 mb]
- J. VARIABLE DRIVE
- 1 - COLLECTION TRENCH MANUALS
- APPENDIX B - MONITORING DURING DREDGING AND CAPPING SOP
- DMP and Inc Coordinates.pdf [61 kb]
- Microsoft Word - Final OL CQAP_ 8_6_12.docx [4.17 mb]
- APPENDIX D - RECORD DWGS
- EAST WALL
- East Wall Design Drawings1 (reduced).pdf [16.42 mb]
- GROUNDWATER PUMP STATION
- TIE BACK
- SPA-001B [5.38 mb]
- WEST WALL
- WILLIS-SEMET WALL
- EAST WALL
- 2014 OCT - OMM PLAN for the OL Lakeshore Barrier Wall Hydraulic Containment System [757 kb]
Operation, Maintenance, and Monitoring Plan for the Onondaga Lake Lakeshore Barrier Wall Hydraulic Containment System - 2014 OCT - Appendix C Forms [13 kb]
- APPENDIX A - EQUIPMENT MANUALS
- 2017 DRAFT ONONDAGA LAKE MONITORING AND MAINTENANCE PLAN
- 2017 Oct - OLMMP Draft (text, tables, figures) [32.4 mb]
Onondaga Lake Monitoring and Maintenance Plan - October 2017 (text, tables and figures) - Appendix A - OL Monitored Natural Recovery Work Plan [7.15 mb]
Appendix A - Onondaga Lake Monitored Natural Recovery Work Plan - Appendix B - OL Biota Tissue Monitoring Work Plan Oct 2017 [3.65 mb]
Appendix B - Onondaga Lake Biota Tissue Monitoring Work Plan Oct 2017 - Appendix C - OL Surface Water Mntrg Work Plan Oct 2017 [7.16 mb]
Appendix C - Onondaga Lake Surface Water Monitoring Work Plan - October 2017 - Appendix D - OL Long-Term Cap Monitoring Work Plan - Oct 2017 [26.29 mb]
Appendix D - Onondaga Lake Long-Term Cap Monitoring Work Plan - Oct 2017 - Appendix E - Habitat Oct 2017 [5.75 mb]
Appendix E - Habitat - October 2017 - Appendix F - WB 1-8 Work Plan - Oct 2017 [1.18 mb]
Appendix F - Wastebeds 1-8 Work Plan - October 2017
- 2017 Oct - OLMMP Draft (text, tables, figures) [32.4 mb]
- 2014 Nov - OL Tissue and biological Monitoring Report for 2013 [2.85 mb]
Onondaga Lake Tissue and biological Monitoring Report for 2013 - November 2013 - 2016 Oct - Addendum 4 (2016) to Onondaga Lake Tissue Mntrg WP [642 kb]
Addendum 4 (2016) to Onondaga Lake Tissue Monitoring Work Plan for 2012, October 2016 - 2016 Oct - WP Onondaga Lake 2016 Cap Monitoring [734 kb]
Work Plan Onondaga Lake 2016 Cap Monitoring, October 2016 - 2017 Apr - PCCP SCA Final Cover Design Submittal [1.15 mb]
Post-Closure Care Plan Onondaga Lake Sediment Consolidation Area (SCA) Final Cover Design Submittal (Appendix E) - April 2017
- 2014 OCTOBER - OPERATION, MAINTENANCE, AND MONITORING PLAN FOR THE ONONDAGA LAKE LAKESHORE BARRIER WALL HYDRAULIC CONTAINMENT SYSTEM
Have a Question?
To ask a question or comment, please click on "Contact Us"
or call 315.552.9784.
The Onondaga Lake Visitors Center was designed and built by Honeywell to provide the public with access to the cleanup.